Post Project Review

For over two decades, I’ve seen engineering teams celebrate wins and grapple with failures. One surprisingly common, and often skipped, step is the thorough post-project review – or "post-mortem" as it's often called. It's tempting to move straight onto the next shiny object, especially when deadlines loom. But consistently skipping this critical step is like building a house on sand – you’re setting yourself up for repeating the same mistakes. Studies have shown a clear link between consistent post-project reviews and improved project performance (Collier, DeMarco, & Fearey, 1996; Anbari, Carayannis, & Voetsch, 2008).

This isn't about finger-pointing. It's about building a learning organization, and frankly, respecting the time and effort your team poured into the project. Here's what I've learned about running effective post-project reviews, moving beyond blame, and turning lessons learned into actionable improvements.

Why Most Post-Mortems Fail (And It's Not What You Think)

The typical post-mortem feels…performative. A meeting where everyone carefully avoids saying anything controversial. The output is a list of vaguely worded “lessons learned” that end up gathering dust in a shared document.

The core problem isn’t the idea of a post-mortem, but how it's conducted. Here are a few common pitfalls:

  • Focus on Blame: This shuts down honest conversation immediately. People will be defensive, not reflective.
  • Vague Action Items: “Improve communication” is a meaningless action item. What specifically will change?
  • Lack of Psychological Safety: If team members fear retribution for honesty, you won’t get honest feedback.
  • Skipping it Altogether: The most common failure. We convince ourselves we're too busy.
  • Treating it as a Checkbox: A perfunctory meeting to satisfy process requirements, rather than a genuine learning opportunity.

The Framework: "What Went Well, What Could Be Improved, Action Items"

I've found a simple framework consistently delivers the most valuable results. It's based on three core questions:

  1. What Went Well? (Start here! Acknowledge successes. This builds positive momentum and reinforces good practices.)
  2. What Could Be Improved? (Focus on processes and systems, not individuals. Frame this as “what obstacles did we encounter?”)
  3. Action Items: (Specific, measurable, achievable, relevant, and time-bound (SMART) steps to address the improvements.)
What Went WellWhat Could Be ImprovedAction Items
Automated testing significantly reduced bug countCode review process was rushed due to tight deadlinesAllocate dedicated time for thorough code reviews in future sprints

Diving Deeper: Beyond the Surface

Don't settle for superficial answers. Here's how to dig deeper:

  • The 5 Whys: When someone identifies a problem, ask "Why?" repeatedly (usually five times) to uncover the root cause. For example, if a deployment failed, you might ask: “Why did the deployment fail?” “Why was the test coverage insufficient?” “Why was there no automated rollback procedure?” This prevents you from addressing symptoms instead of the underlying issue.
  • Focus on Systemic Issues: Is a bug the fault of a developer, or a lack of robust testing procedures? Is a missed deadline due to an individual’s performance, or unrealistic estimations?
  • Separate “Known Knowns” from “Known Unknowns”: “Known Knowns” are things everyone was aware of. “Known Unknowns” are risks you identified but didn’t mitigate. For example, a ‘Known Known’ might be a recurring bug in a specific module, while a ‘Known Unknown’ might be the potential for a third-party API to experience downtime. Understanding the difference helps prioritize preventative measures. (And honestly, “Unknown Unknowns” – the things you didn’t know you didn’t know – are largely accepted, though discussing them can still be valuable.)
  • Be Brutally Honest About Estimation: Did you consistently underestimate tasks? If so, why? Are your estimation techniques flawed? This is a tough conversation, but crucial for accurate planning.

Creating a Safe Space: Psychological Safety is Key

This is the hardest part, but the most important. Building a truly safe space requires ongoing effort and consistent reinforcement. Here are a few tips:

  • The Facilitator Role: Designate a neutral facilitator (not the project lead) to guide the discussion. Their job is to ensure everyone has a voice and to prevent blaming.
  • Anonymous Input (Optional): Consider using an anonymous survey or brainstorming tool before the meeting to gather initial feedback.
  • Lead by Example: Be the first to admit your own mistakes. This sets the tone for vulnerability and openness.
  • Focus on Learning, Not Punishment: Reinforce that the goal is to improve, not to assign blame.

Turning Insights into Action: The Follow-Through

The post-mortem is useless if you don't act on the findings.

  • Prioritize Action Items: Don’t try to fix everything at once. Focus on the most impactful improvements.
  • Assign Ownership: Clearly assign responsibility for each action item.
  • Track Progress: To ensure accountability, add action items to your team’s preferred project tracking tool – options include Jira, Trello, and ClickUp. Track progress regularly.
  • Review and Iterate: In subsequent post-mortems, revisit previous action items to ensure they’ve been implemented and are effective.

Beyond the Meeting: A Culture of Continuous Improvement

Effective post-project reviews aren’t just about a single meeting. They're about cultivating a culture of continuous improvement. By consistently reflecting on what went well and what could be better, you can build a more resilient, adaptable, and high-performing engineering team.

Skip the post-mortem at your peril. Invest the time, create a safe space, and turn those lessons learned into real, lasting improvements. To get started, schedule a 30-minute team discussion to brainstorm how to improve your next post-mortem process. This practice not only strengthens your team but can also lead to reduced costs, faster delivery, and improved overall morale. Your team will thank you.